Project Summary: We were contacted by MOT to provide a revegetation solution on the Coquihalla Hwy medians by the Mine Creek Rest Area.
The medians were rebuilt after a construction project in summer 2021. Efforts to revegetate the rebuilt medians by hydroseeding proved inadequate during the 2021 rain events.
Denbow were approached to provide a durable grow media / revegetation solution using EcoBlanket and treeraseeding with MOTI’s preferred seed blend.
The project was successful and the resulting median vegetation is thriving 1 year post installation.
* Product: Grow Media for Eco-Blanket
* YD3: 1100
– Priority Area to start with measurements: 2200m x 8.5m = 18,700m2…….Overall Combined Areas = 3.3 hectares ( 355,209 ft2 )
* Seed: Thompson Okanagan Interior Forestland Mix
* Fertilizer: 18-18-18
* Microblend: 1 kg / 1 yd3 of Grow Media
Highway median revegetation
Installing Eco-Blanket into 3 areas of median between the fast lanes of the north & south bound sections of hwy between Coquihalla Lakes Exit & Mine