Project Profile Video: Installing EcoBlanket onto a slope from a barge in Belcarra, BC.
The site was not accessible by road, so a blower truck and reload trailer were barged to the site. Installation was done from the truck on the barge, over 400 feet / 120 meters onto the slope to control erosion and vegetate the area. The blower truck was reloaded by the tipper trailer while on the barge.
Terraseeded™ installation was completed in September 2017; the February 2018 image shows germination & growth over the winter.
Project for West Coast Turn Key.